JEGS 80087

JEGS 45 Degree Double Flare Tool

Modèle: 80087

Produit terminéview

The JEGS 45 Degree Double Flare Tool is designed for creating precise double flares on various types of tubing, including stainless steel, steel, aluminum, and 0.040" copper tubing. This tool is essential for automotive and other applications requiring secure, leak-free connections in fluid lines.

The kit includes a lever-lock flaring bar, a floating cone yoke assembly, and multiple dies to accommodate common tubing sizes. Its robust construction ensures durability and accuracy for professional and DIY use.

JEGS 45 Degree Double Flare Tool kit components in a black storage tray

Figure 1: The JEGS 45 Degree Double Flare Tool kit, showcasing the flaring bar, yoke assembly, and various dies within its storage tray.

Contenu du kit

  • Lever-Lock Flaring Bar (for tubing sizes: 3/16", 1/4", 5/16", 3/8", 1/2" O.D.)
  • Yoke Assembly with Floating Cone
  • Multiple Dies for Double Flaring
  • Plateau de stockage
  • Manuel d'instructions

Configuration et préparation

  1. Inspecter les composants : Before use, ensure all components of the flare tool kit are present and free from damage.
  2. Préparer le tube :
    • Cut the tubing to the desired length using a tubing cutter, ensuring a clean, square cut.
    • Deburr both the inside and outside edges of the tubing end. A clean, burr-free edge is critical for a proper flare.
    • Clean the tubing thoroughly to remove any debris or metal shavings.
  3. Select Correct Die: Choose the appropriate die for the tubing size you are working with.

Operating Instructions: Creating a Double Flare

Follow these steps carefully to create a professional double flare:

  1. Insert Tubing into Flaring Bar:
    • Open the lever-lock flaring bar and insert the prepared tubing into the correct size hole.
    • Position the tubing so that it extends slightly beyond the face of the flaring bar. The exact extension depends on the tubing size and the die being used. Refer to the tool's markings or specific instructions for precise measurement.
    • Securely close the lever-lock to clamp the tubing firmly in place. Ensure the tubing is straight and not angled.
  2. First Flare (Pre-Flare):
    • Place the selected die into the end of the tubing.
    • Position the yoke assembly over the flaring bar, aligning the floating cone with the center of the die.
    • Slowly turn the handle of the yoke assembly clockwise. The floating cone will press the die into the tubing, forming the first, inverted flare.
    • Continue turning until the die bottoms out against the flaring bar. Do not overtighten.
    • Unscrew the yoke assembly and remove the die. The tubing should now have an inverted, funnel-like shape.
  3. Second Flare (Finishing Flare):
    • Without removing the tubing from the flaring bar, reposition the yoke assembly over the flaring bar. This time, the floating cone will directly engage the inverted flare.
    • Slowly turn the handle of the yoke assembly clockwise. The floating cone will push the inverted flare back onto itself, creating the double flare.
    • Continue turning until the floating cone bottoms out against the flaring bar. This ensures a complete and uniform double flare.
    • Unscrew the yoke assembly.
  4. Retirer et inspecter :
    • Open the lever-lock flaring bar and carefully remove the flared tubing.
    • Inspect the double flare for uniformity, cracks, or imperfections. A properly formed double flare should be smooth, concentric, and free of defects.

Entretien

  • Nettoyage: After each use, wipe down all components of the flare tool with a clean, dry cloth to remove any metal shavings, dirt, or oil.
  • Lubrification: Periodically apply a light coat of machine oil to the threads of the yoke assembly's screw and the moving parts of the flaring bar to ensure smooth operation and prevent corrosion.
  • Stockage: Store the tool and all its components in the provided storage tray in a clean, dry environment to protect it from dust, moisture, and damage.

Dépannage

ProblèmeCause possibleSolution
Uneven or Crooked FlareTubing not cut square; tubing not deburred; tubing not clamped straight in flaring bar; die or cone not centered.Ensure tubing is cut square and deburred. Re-clamp tubing straight and tight. Verify die and cone alignment before tightening.
Cracked or Split FlareTubing material too hard for tool; tubing not properly deburred; overtightening; incorrect die used.Confirm tubing material is compatible. Ensure tubing is thoroughly deburred. Avoid overtightening. Use the correct size die.
Flare Too Small or Too LargeIncorrect tubing extension from flaring bar; incorrect die used.Adjust tubing extension as per instructions. Ensure the correct die is selected for the tubing size.
Tool Difficult to OperateLack of lubrication; debris in threads.Clean and lubricate the yoke assembly threads and other moving parts.

Caractéristiques

  • Numéro de modèle : 80087
  • Flare Type: 45 Degree Double Flare
  • Compatible Tubing Materials: Stainless Steel, Steel, Aluminum, 0.040" Copper Tubing
  • Compatible Tubing Sizes (O.D.): 3/16", 1/4", 5/16", 3/8", 1/2"
  • Poids de l'article : Environ 3 livres
  • Dimensions du produit : Environ 7.5 x 5.6 x 1.2 pouces
  • Fabricant: JEG

Garantie et assistance

For warranty information, technical support, or replacement parts, please contact JEGS customer service directly. Refer to the contact information provided with your purchase or visit the official JEGS website.

JEGS Customer Service: Visit JEGS.com/contactus

Documents connexes - 80087

Préview Instructions d'installation du kit de freins à disque JEGS 555-630101 pour Impala, Bel Air, Biscayne
Comprehensive installation guide for the JEGS 555-630101 Disc Brake Kit, designed for Chevrolet Impala, Bel Air, and Biscayne models. Includes parts list, tools required, step-by-step instructions, and troubleshooting tips for upgrading your vehicle's braking system.
Préview JEGS 631479: 1963-1970 Chevy Truck Front Disc Brake Kit Installation Instructions
Comprehensive installation guide for the JEGS 631479 Front Disc Brake Kit, designed for 1963-1970 Chevrolet C10 trucks. This manual provides detailed steps for removing drum brakes and installing a new disc brake system for improved vehicle performance and safety.
Préview Guide d'installation de la pompe à vide électrique JEGS 555-63019
Guide d'installation de la pompe à vide électrique JEGS (modèle 555-63019). Ce guide fournit des instructions sur le montage, le câblage, les consignes de sécurité et les informations de fonctionnement pour une utilisation automobile.
Préview Guide d'installation et de remplacement du filtre à carburant JEGS Billet
Instructions complètes d'installation et de remplacement des filtres à carburant JEGS Billet (modèles 15030 à 15068). Comprend les options de montage, les avertissements de sécurité et les étapes d'assemblage pour la pièce n° 555-15045.
Préview Guide d'utilisation du générateur portable JEGS 86004 5250W
Guide d'utilisation du groupe électrogène portable JEGS 86004. Ce guide couvre l'assemblage, le fonctionnement, la sécurité, l'entretien et le dépannage du groupe électrogène de 5 250 watts.
Préview Guide d'assemblage de la boîte à outils JEGS 72 po en acier inoxydable à 15 tiroirs avec armoires
Guide d'assemblage de la boîte à outils JEGS 72 po en acier inoxydable à 15 tiroirs avec armoires. Ce guide comprend une liste détaillée des pièces, les consignes de sécurité, les instructions d'installation étape par étape, les informations électriques, le fonctionnement des tiroirs, les instructions relatives aux dispositifs anti-basculement et des conseils d'entretien.